Tannoy SUBWOOFERS Instrukcja Użytkownika Strona 12

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 28
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 11
12
ME CHANI CAL INSTALLATION 110TB
NEW / EXISTING CONSTRUC TION INSTA LLATION PROC EDURES:
Before
You Begin:
Please read an d un d erstan d all o f th ese in stru ctio n s th o ro u gh ly b efo re b eg in nin g an y wo rk.
Note t ha t construction work for t he insta llation of all Tannoy products must be done to local building codes by
qualified, licensed installers. A local building inspect or should approve any overhead inst allations. Tannoy assumes
no liability for cause and effect of improper installation work.
Y
our Package Includes:
Th e 110TB ceilin g su b is co m p lete with ru b b er iso latio n g rid aro u n d th e grille pe rimeter t o drop neatly int o a properly
secured, 2’ x 2’ ce iling g rid w ith out v ibra t ion or resonance.
Additional
Considerations:
Survey your site and choo se an installation location .
At this point, you may choose to s us pend the s ubwoofer in free s pace or in a 2 s pace x 2 s pace dropped ceiling
grid inst allation.
P
art s/ Tools Required: (Installation Dependant)
Hanger bolts (Fig. 1). Thes e can be purchas ed for ins tallation into wood, or into metal,
for e x ample, with a Hilti™ power fast en ing syst e m.
C ouplin g nu t s, an d Backin g n ut s (Fig s. 2 & 3).
•Threadedrod(Fig.4).
•Turnbuckles(Fig.5).
Wire rope, w ir e rope nut s, thimble s, ch a in, quick-lin ks (Fig s. 5 & 6) .
Wire grid t ie s (Fig . 8) .
Note:
For 2’ space x 2’ space t ile bridge drop in, y ou will require w ire grid su pport tie s on ea ch of t he four corne rs of
t he grid imme diat e ly beside th e subw oofer. This is u sually accomplished by mea ns of t he same w ire support t ie used t o
support t he grid and for light ing fixtures, etc. IT IS IMPOR
TAN T TOALWAYS TETHER THE S UBWOOFER S ECURELYTO
THE BUILDING’S PERMANENT S TRUCTURE USI NG CHAIN (Fig. 9) OR WIRE ROPE. TH IS IS TH E SEISMIC TETH ER
POI NT.
The list abov e is a suggest e d sele ction of parts only ; what y ou re quire w ill de pend on you r suspe nsion me thod and
physical locat ion .
Th e 110TB is supp lied with fo u r 3/8” clo sed eye b o lts alread y at tached. W h en su sp en d in g in free sp ace , it is
re comme nde d t hat you use t he same size hangers, nut s, rod, and fit tings; alternat e ly, if you are using wire rope ,
1/8” rope and fit tings are t he smallest y ou should conside r.
Przeglądanie stron 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 27 28

Komentarze do niniejszej Instrukcji

Brak uwag